Read the quarter in context.
A source-linked quarter view: reported numbers, management language, guidance, and the risks that should carry forward.
ConCallIQ research layer
Signal, with the source still visible.
Use the controls below to narrow the view, then follow the evidence into the next layer of context.
Revenue
₹152 Cr
verification pending
Revenue YoY
-16%
reported change
EBITDA
₹7 Cr
latest reported figure
Source
bse pending
record provenance
Actual signal trajectory
Where this quarter sits.
Quarter read
What the record says.
Maan Aluminium reported a weak Q3 FY26 with revenue of ₹152 crore, down 16% YoY, driven by a conscious reduction in low-margin trading and a sharp decline in export orders. EBITDA grew 15% YoY to ₹7 crore, but margins remained low at 5% due to under-utilization of the newly expanded 24,000-tonne capacity (utilization ~25%) and ramp-up costs. The US order cancellation of ~450 tonnes (impacting ₹5-6 crore profit) and delayed Korean raw material supply for the Dewas precision tubing project further pressured performance. Management guided for gradual improvement from FY27, targeting 18,000 tonnes volume and ~₹500 crore manufacturing revenue next year, with normalized EBITDA margins of ~8% over the medium term. Key risks include prolonged US tariff uncertainty and delays in aerospace/defense approvals.
Colored figures show movement against the previous available record.
Guidance to track
- Management expects manufacturing revenue to reach ~₹500 crore in FY27, driven by higher capacity utilization and new contracts.
- Management guided for total volume of 18,000 tonnes in FY27, up from ~8,000 tonnes in FY26 (annualized).
- Management expects EBITDA margins to normalize around 8% as capacity utilization improves and value-added share increases.
- The Dewas precision tubing plant is expected to contribute over ₹100 crore annually once fully ramped up, with higher margins than legacy extrusion.
Risks flagged
- US orders were cancelled due to 500% duty threat on Indian aluminium; recovery uncertain despite ongoing negotiations.
- Korean supplier delayed raw material delivery by 8-9 months, pushing back commercial commissioning of precision tubing project.
- Current utilization at 25% leads to poor operating leverage; ramp-up to 80%+ may take 12-18 months, keeping margins subdued.
- Audit discrepancies remain; management expects clearance in 2.5 months, but any delay could push revenue contribution to FY28.
Key quotes
- Our focus basically remains on increasing our value added share particularly in the domestic markets and improving our capacity utilization strengthening our margins through precision machining and anodizing.
- We have lost around about 5 to 6 cr rupees profit in US order cancellation.
- We are not much interested in architecture. Our main focus is aerospace and defense.
Research modules
